DEVELOPMENT OF A BUILDING DREAM ON A UNIQUE SITE IN ACCORDANCE WITH REGULATIONS
EXCLUSIVE LIVING FRAME
A plot can have different uses, one of which is outside the zone. This means that it is not in the right destination according to the current plans. An obvious example of this is a house in a nature reserve. This construction can be considered legal if it is licensed or deemed to be licensed.
LEGAL
The possibilities of renovating or rebuilding - thus expanding - a house outside the zone are determined by law. The rules depend on the situation. At the time of the application for planning permission, the house must not be dilapidated. So the premises must meet the elementary requirements of stability. In addition, the house must be licensed or deemed to be licensed. Rules also apply to detached outbuildings. A house outside the zone may be (re)built/expanded up to a maximum volume of 1000 m³, with a volume increase of no more than 100%. And did you know that in a house outside the zone, even an independent exercise room of up to 100 m² is possible? If it is housed in an adjacent barn, it does not even belong to the maximum volume of 1000 m³.
OUR EXPERTISE
The way in which we compile a file that is foreign to a zone requires a certain approach resulting from experience and expertise. Very important are the discussions with the right authorities. Consulting and negotiating with competent authorities is one of the strengths of Magnus Villas. For many years, we have realized various out-of-zone homes, each with its own problems. Through these achievements, we have gained the necessary expertise to professionally guide you during the reconstruction or renovation of your house outside the zone.
Villa KS
architecture - interior - garden
Villa MJ
2020
architecture - interior - garden
Villa OR
2021
architecture - interior - garden
Villa SC
2017
architecture - interior - garden
Building trajectory outside the zone
Ontwikkeling bouwdroom op een uniek terrein conform reglementeringen
Traject zonevreemd bouwen
Step 1 - appointment to get acquainted with MV & client + discussion of zonal building plans
Step 2 - Investigate maximization of zonal building plans, this may already have happened prior to Step 1.
Step 3 - First meeting with architect
Step 4 - Result commitment architect
Step 5 - Planning design phase with optimization
Step 6 - Go over the detailed offer
Step 7 - Study agreement client & Magnus Villas ifvoa start-up studies EPB, ventilation & stability
Step 8 - Apply for a building permit
Step 9 - Building contract
Step 10 - Start of work: project manager schedules fixed times for site meetings
Step 11 - Provisional delivery
Step 12 - Living pleasure
Step 13 - Final delivery: 1 year after provisional delivery
We gebruiken cookies op onze website om u de meest relevante ervaring te bieden door uw voorkeuren en herhaalbezoeken te onthouden. Door op "Accepteren" te klikken, stemt u in met het gebruik van ALLE cookies.
Deze website maakt gebruik van cookies om uw browse-ervaring te verbeteren terwijl u door de website navigeert. Van deze cookies worden de cookies die als noodzakelijk zijn gecategoriseerd in uw browser opgeslagen, omdat ze essentieel zijn voor de werking van basisfunctionaliteiten van de website. We gebruiken ook cookies van derden die ons helpen analyseren en begrijpen hoe u deze website gebruikt. Deze cookies worden alleen met uw toestemming in uw browser opgeslagen. U heeft ook de mogelijkheid om u af te melden voor deze cookies. Maar het uitschakelen van sommige van deze cookies kan een effect hebben op uw browse-ervaring.